Gold Member Since 2014
Audited Supplier
Dongguan Taizheng Wire Machine Co., Ltd.

Halogen Free Telecommunications Cable Extrusion, Cable Extrusion Production Line, Plastic Machine manufacturer / supplier in China, offering Halogen Free Telecommunications Cable Extrusion Production Line, Physical Foaming Coaxial Cable Manufacturing Line, PVC Plastic Extrusion Machine Production Line and so on.

(/ )

Supplier Homepage Product TZ-EL LSZH cable extrusion line Halogen Free Telecommunications Cable Extrusion Production Line

Halogen Free Telecommunications Cable Extrusion Production Line

Purchase Qty.:
(Pieces)
1 2 3 4+
FOB Unit Price: US $48,800 US $48,500 US $48,400 US $48,000
Purchase Qty. (Pieces) FOB Unit Price
1 US $48,800
2 US $48,500
3 US $48,400
4+ US $48,000
Get Latest Price
Port: Shekou, China
Production Capacity: 20 Set/Month
Payment Terms: L/C, T/T, CASH

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: TZ-Unit
  • Warranty: 12 Months
  • Bearing: NSK
  • Lead Time: 20 Working Days
  • Motor: Siemens
  • Production Line Length: 19 Meters at Least
  • Demoulding: Automatic
  • Function: High Temperature Resistance
  • Automatic Grade: Automatic
  • Customized: Customized
  • Transport Package: Wooden Box in Export Standards
  • Origin: China
  • Certification: CE, ISO
  • Delivery Way: FCL or LCL
  • Registered Trademark: Taizheng
  • Installation Overseas: Provided
  • Inverter: Emerson
  • Precision: High Precision
  • Heating System: Electric
  • Mould Life: >1,000,000 shots
  • Condition: New
  • Trademark: TAIZHENG
  • Specification: CE, CCC, SGS
  • HS Code: 84485190
Product Description
Halogen free telecommunications cable extrusion production line

Applications:
Apply to Extrusion machine specializes in producing tandem extruding line such as UL 2488, 2651, 2678 and other computer flat cables.

Technique Feature:
Machine head adopts automatic type and special line-storing set, Because of Taiwan technology's introduction and our many years' making experience, we elevates line's extrusion speed, solve many problems such as thickness's inequality, poor adherence, stress's inequality, copper line's shrinking after cutting, line-cutting rate and production's enabling rate sharply become low, become best choice of manufacturers. Manufacturers can select big screen diameter-test instrument in order to control wire's width.
Machinry typeTZ-65TZ-70TZ-80TZ-90TZ-120TZ-150
Pay-off line typeDual axisDual axisDual axisDual axis/
Max axis
Max axisMax axis
Pay-off line axis500-630mm500-630mm500-630mm630-1200mm1600-2000mm2000-2500mm
Screw diameterφ65φ70φ80φ90φ120φ150
Screw scale lenget/diameter25:125:125:125:125:125:1
Extrusions capacity kg/h120140180230380500
Main machine motor power25HP30HP40HP60HP70HP100HP
Wire diameter specificationφ1.0-10Φ2.0-15Φ3.0-25Φ5.0-35Φ12-40Φ15-120
Temperature control7paraeraph7paraeraph8paraeraph8paraeraph8paraeraph8paraeraph
Cooling systemU TypeU TypeU TypeU TypeU TypeU Type
Towing power5HP5HP7.5HP7.5HP10HP15HP
Preserve line typeLevel wayLevel wayLevel wayLevel way  
Preserve length(M)200200200200--
Put line speed(M/min)MAX400MAX400MAX300MAX200MAX100MAX100
Take-up line typeDual axis/
Max axis
Dual axis/
Max axis
Max axisMax axisMax axisMax axis
Take-up line axis500-630mm630-1250mm630-1250mm630-1250mm630-1250mm2000-2500mm
Electrical controlFrequency
+PLC
Frequency
+PLC
Frequency
PLC
Frequency
+PLC
Frequency
+PLC
Frequency
+PLC
 

Remarks:
Supply-side required dates and docunments(a&b provide within 7 working days after signed the contract, others attache when delivery)
A. Full set of equipment installation layout.
B. Water, electricity and gas supply requirements and the amount of interface.
Equipment consumables and wearing parts lists, grades and their origin, vulnerable parts of the provision of spare parts map.
Control components and electrical specifications, models list, Converter Manual.
Electrical schematics, product manual, the ultimate test books, machine operation and maintenance manuals.

Packing List:
Supply-side should provide the service as below: (after deliveryed the machine)
To arrange assistance for installation, adjustment and operating test.
Technician arranged to be guided by supplier when operating the machine
Demand-side should providing facilities and the preparation projects as below: (After deliveryed the machine)
Power source, water source, compressed-air line and related project
Not listed connector device.
Needed materials for product testing
Send your message to this supplier
Avatar
Mr. Andrew Liao
Sales Manager
*From:
To: Mr. Andrew Liao
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now